• Facebook
  • Instagram

© 2019 Imperium Energy Inc.. All Rights Reserved.

Solar Panel Installation Process

With an average turnaround time of two weeks, we set the industry standard. No company in Los Angeles does it faster!

Fast, Efficient-Solar Panel Installations Done In An Average of Two Weeks from Agreement

Step 1-The Consultation

Step 2-Initial Site Inspection

Step 3-Design & Layout Planning

Step 4 - Permits

Step 5 - The Installation

Step 6 - Final Inspection

Step 7 - PTO (Permission to Operate)

Ready to switch to solar?

Making the switch has never been easier. It starts with a conversation and a FREE quote from an Imperiums Panel Expert.

Why Choose Imperium Solar

Top Quality Brands with Multiple Installation Options.

Maximize Tax Incentive Beyond 30% When Combined with Roofing, Turf Installation, HVAC, ect.

Fastest Installation in the Industry-2 Week Guarantee.

Locally Owned & Operated.

Professionally Architected Aesthetic Designs-No Conduit or Visible Wiring.

Roofing Expertise-No Leaks.

Serving Los Angeles County, For Angelenos, By Angelino's.